Plan the station around the gaps and changes between real winery runs. Give the supplier the carton sizes, weights and tape or adhesive reference. Ask how cases reach the operator and where accepted cases go. Include room for supplies and agreed maintenance.
Measure the pace during an intermittent run
Ask for a trial with the usual staff and case mix. Record the time from the start of the short job to accepted cases and any adjustment for the next carton. Confirm the layout and approved operating conditions with the site team.
| Decision | Job A | Job B |
|---|---|---|
| Case dimensions and packed weight | ___ | ___ |
| Operator feed and case support | ___ | ___ |
| First good case and setup time | ___ | ___ |
| Materials and taper change | ___ | ___ |
If a lot of 60 cases takes four minutes at the machine but another five to build and deliver to the infeed, the complete lot still requires about nine minutes when one person does both jobs. Repeat with the largest case the operator handles. Ask which work can overlap safely and which stops the sealer while it is being done.
Set the sealer within the complete end-of-line layout
Review an operator-fed sealer for the winery
Send carton drawings, batch lengths and the available work area.